Gallery

From the job site.

A growing collection of photographs from live ground investigation work — the ordinary, the awkward and the outright awkward. If it can be reached safely, we can work it.

CK Drilling operative in high-visibility coveralls and hard hat running a dynamic probing rig on the muddy Thames foreshore at low tide, with Tower Bridge in the background

Access is never an issue!

Dynamic probing on the Thames foreshore at low tide — rig, operative and stabilising plates set up on wet gravel and silt with Tower Bridge overhead. Working to the tide table, not against it.

Technician in high-visibility PPE running a vertical diamond coring drill on wet block paving behind a CK Drilling van, with an electricity pylon beyond
Precision diamond coring in a tight, low-headroom spot right beside National Grid pylons — no room for error, no problem for us.
Compact red tracked CK Drilling rig parked on gravel in front of high-voltage electrical substation equipment
Trusted to work inside live National Grid substations — our compact rig set up safely among high-voltage switchgear.
Operatives in orange high-visibility gear monitoring embankment drilling equipment while a Thameslink train passes on the adjacent tracks
Embankment drilling metres from a live Thameslink line — trains passing at speed while our team works on undisturbed.
Bobcat mini excavator fitted with a hydraulic breaker working beside roadworks, with a stop sign and passing traffic in the background
Breaking out concrete beside live traffic on a busy carriageway — roadworks keep moving and so do we.
Two operatives in high-visibility vests manually moving a compact mini excavator on a skate dolly through an indoor facility corridor
Indoor job with no machine access? We skate the excavator through the building by hand to get it done.
Bobcat mini excavator resting on a temporary composite mat roadway laid across a green field, heading toward an electricity pylon under storm clouds
No track to the pylon? We lay our own mat roadway across open fields to reach National Grid structures.
Long concrete core samples laid end to end on a concrete floor beside hazard-striped edging, a caution cone and coring equipment
Metre after metre of clean, continuous concrete cores — the quality of our work speaks for itself.

More photos coming

We are adding more site pictures as jobs finish. In the meantime, send us your location and scope — we will tell you honestly whether access is a problem or not.

Request a quote